CORREN POSITION: HOME1 > NEWS CENTER > News

CNTIC Bangladeshi Ashuganj Power Station Project First Construction Drawing Design Review Meeting Held

Source: Author: Date:2019-05-06【Font:B M S

On the Morning of May 6, the first construction drawing design review meeting for the Bangladeshi Ashuganj Power Station Project of CNTIC was held at Fujian Electric Power Survey & Design Institute, attended by members of the project office of the Ashuganj Power Station Project as well as the Bangladeshi project owner, supervisor and personnel of the Fujian Electric Power Survey & Design Institute.