In the afternoon of April 30, the boiler hydro test of the start-up boiler of PLTU2 Jetang 1X660MW Adipala, Cilacap Contracted by CNTIC was succeeded on its first try. There are no leakage of the the pressure parts, valves and welded junctions in the heating surface, while all the quality are satisfying. The Owner, PLN, and local representatives from the Ministry of Labor witness the all process of this test.