CORREN POSITION: HOME1 > NEWS CENTER > News

PILING IN BOILER AREA FOR PLTU SUMATERA BARAT(2X112MW) PROJECT START

Source: Author: Date:2010-03-23【Font:B M S
The ceremony for the first piling in boiler area for the PLTU SUMATERA BARAT (2X112MW) project was held at project site in PADANG, INDONESIA on March 19, 2010.  The Owner(PLN), consortium partner (REKAYASA), and the relevant personnel of CNTIC participated the ceremony. The first piling started at two O’clock and  achieved successfully the designed elevation at 4: 10 in the afternoon. The piling in boiler area is an important milestone for PLTU SUMATERA BARAT(2X112MW) project, symbolizing the start of a critical path in project civil construction .