CORREN POSITION: HOME1 > NEWS CENTER > News

Ashuganj Power Plant (East) in Bangladesh realizes single-cycle grid connection at one go

Source: Author: Date:2022-06-20【Font:B M S

At 12: 42 on June 20th, local time, with the overall coordination of the Project Department, the strong support of subcontractors and main unit manufacturers, and the witness of the owner and the supervision company, the 400MW combined cycle gas turbine power station of the Ashuganj Power Plant (East) Project, built in Bangladesh by GENERTEC CNTIC, was approved by the power grid dispatching authority, and its single-cycle gas turbine was successfully connected to the grid at one go.