CORREN POSITION: HOME1 > NEWS CENTER > Picture News

Gas Turbine of CNTIC Bangladesh Ashuganj Power Plant (East) Project Successfully Located

Source: Author: Date:2020-02-28【Font:B M S



At 10:38 am local time on February 27th, the gas turbine of Bangladesh Ashuganj Power Plant (East) Project undertaken by CNTIC was smoothly hoisted. With the total weight of 315 tons, the gas turbine is the core equipment of the entire project.