CORREN POSITION: HOME1 > NEWS CENTER > Picture News

Overseas Attraction: Unit-2 of 2×660mw Super Critical Coal Fired Thermal Power Project Contracted by CNTIC Realizes Operation at Full Load Successfully

Source: Author: Date:2017-02-17【Font:B M S


At five o’clock on Feb. 15th, local time at India, the plant output of Unit-2 of 2×660mw Super Critical Coal Fired Thermal Power Project contracted by CNTIC reached the designed requirement 660MW at first time, realizing operation at full load successfully.