CORREN POSITION: HOME1 > NEWS CENTER > Picture News

The Third Detailed Design Review Meeting of CNTIC Bangladesh Ghorasal Power Station Project Was Held Successfully

Source: Author: Date:2016-10-14【Font:B M S



On October 8th, the third detailed design review meeting of CNTIC Bangladesh Ghorasal Power Station Project was held successfully in Fujian Electric Power Survey & Design Institute (FEDI). The Owner from Bangladesh, the staffs from supervision, Fujian Electric Power Survey & Design Institute, and project department of CNTIC attended the meeting.