CORREN POSITION: HOME1 > NEWS CENTER > Picture News

First Phase of Wuhu Xinxing Ductile Iron Pipes Photovoltaic Project Connected to the Grid and Commencing Power Generation

Source: Author: Date:2024-06-25【Font:B M S

 On June 24th, the first phase of the distributed rooftop photovoltaic project at the Wuhu Xinxing was successfully connected to the grid and officially entered the power generation stage.

The total designed capacity of the project is 35 MWp, with plans for two phases of grid connection. The annual power generation of the first phase is expected to be approximately 7.02 million kWh, which can save about 2,300 tons of standard coal per year, and reduce carbon dioxide emissions by around 7,000 tons and sulfur dioxide emissions by about 210 tons.